Tower Installation

Tower Installation

Erection of the wind turbine tower required use of a 440-ton, 315-foot Manitowoc 16000 crane, which was delivered to the site on 18 flatbed trailers and assembled near the "LF-1" treatment system over four days. Construction occurred without disruption to LF-1 system operations, which include two (blue) tanks for managing backwashing water. Mobile equipment used for each P&T system includes one (red) frac tank with two carbon vessels for treating water pumped during well maintenance.