Documents

Search Results

Your search returned 1 record. Page 1 of 1

Pilot Project to Optimize Ground Water Remediation Systems at RCRA Corrective Action Facilities: Summary Report and Lessons Learned Published 2004
Based on previous success with conducting independent optimization evaluations at Fund-lead pump and treat sites (i.e., those sites with pump and treat systems funded and managed by Superfund and the States), the EPA Office of Superfund Remediation and Technology Innovation (OSRTI) and the Office of Solid Waste (OSW) commissioned a study to pilot similar evaluations at facilities subject to corrective action under the Resource Conservation and Recovery Act (RCRA). During 2003 and 2004, independent evaluations were performed at five RCRA facilities by an independent EPA contractor. The Remediation System Evaluation (RSE) process developed by the U.S. Army Corps of Engineers was used. For each of the five sites, the RSE process included a review of site documents, a site tour to interview site stakeholders, and preparation of an RSE report. The RSE reports provided site background, summarized the findings from the site visit, and provided recommendations.

Note: The CLU-IN Publications and Studio area only contains publications that are a sole or key source of information on a particular hazardous waste management problem. You may also visit the CLU-IN site-wide search engine to locate additional publications available through other areas of CLU-IN.