Documents

Search Results

Your search returned 1 record. Page 1 of 1

Manasota Plating: Produced by U.S. EPA Environmental Response Team Published
An abandoned electroplating company in Sarasota, Florida was the site for the emergency removal of contaminated soils. Since the water table was so close to the surface, an on-site dewatering operation and water treatment facility was the most cost effective way to treat the 400,000 gallons of contaminated groundwater. During this three year project for the EPA Region IV team, wells were installed to determine groundwater contamination from cyanide, VOCs, and various heavy metals. This video demonstrates the steps taken to install these systems. Running time is 10 minutes.

Note: The CLU-IN Publications and Studio area only contains publications that are a sole or key source of information on a particular hazardous waste management problem. You may also visit the CLU-IN site-wide search engine to locate additional publications available through other areas of CLU-IN.