State Coalition for Remediation of Drycleaners Site Profiles
Touch of Class Cleaners, Orlando, Florida
Description
|
PCE drycleaning operations were conducted at this site from 1987 to 1998. A dry drop-off facility currently occupies the bay that formerly housed the drycleaning operation. The site is located in a shopping center in a retail commercial/residential setting.
The identified contaminant source area at the site is soil beneath the faciliyt floor slab in the vicinity of the drycleaning machine. Remediation Status: In groundwater monitoring |
Contaminants
Contaminants present and the highest amount
detected in both soil and groundwater.
Contaminant | Media | Concentration (ppb) | Nondetect |
---|---|---|---|
cis-1,2-Dichloroethene | groundwater | ||
Tetrachloroethene (PCE) | groundwater | ||
Tetrachloroethene (PCE) | soil | ||
Trichloroethene (TCE) | groundwater |
Site Hydrology
Deepest Significant Groundwater Contamination: | 22ft bgs | |
Plume Size: | Plume Length: 180ft Plume Width: 100ft Plume Thickness: 15ft |
|
Average Depth to Groundwater: | 7.18ft |
Lithology and Subsurface Geology
silty, fine-grained sand Depth: 0-22ft bgs 22ft thick Conductivity: 2.8ft/day Gradient: 0.006ft/ft |
||
clay and sandy clay Depth: 22-38ft bgs 16ft thick |
||
clayey, fine-grained sand and sandy clay Depth: 38-99ft bgs 61ft thick |
Pathways and DNAPL Presence
Groundwater Sediments Soil DNAPL Present |
Vapor Intrusion Pathway
Has the potential for vapor intrusion (VI) been evaluated? |
No |
|
Has a vapor mitigation system been installed? |
Yes | |
Type of Vapor Mitigation System(s): |
Soil Vapor Extraction |
Remediation Scenario
Cleanup
Goals: |
Groundwater: PCE = 3 ug/l, TCE = 3 ug/l, cis 1,2-DCE = 70 ug/l Soil: PCE = 30 ug/kg |
|
Remedy Level: |
Full Scale Remedy |
Technologies
In Situ Monitored Natural Attenuation |
Why the technology was selected: Date implemented: Results to date: Next Steps: Cost to Design and Implement: |
|
In Situ Soil Vapor Extraction |
Why the technology was selected: Date implemented: Final remediation design: Results to date: Next Steps: Cost to Design and Implement: |
|
Ex Situ Carbon Adsorption |
Date implemented: Final remediation design: Results to date: Next Steps: Cost to Design and Implement: |
Costs
Cost
for Assessment: |
$92,000 | |
Cost
for Operation and Maintenance: |
SVE system O&M: $65,300 | |
Total
Costs for Cleanup: |
$252,700 |
Contacts
Aaron Cohen Florida Dept. of Environmental Protection Bureau of Waste Cleanup, MS 4500 2600 Blair Stone Road Tallahassee, Florida 32399 850-245-8974 Aaron.Cohen@dep.state.fl.us Doug Rodgers, P.E. Shaw Environmental, Inc. 725 U.S. Highway 301 South Tampa, Florida 33619-4349 Phone: (813) 612-3623 Doug.Rodgers@shawgrp.com |
Site Specific References
Site Assessment Report: March 1999 Remedial Action Plan: August 2000 Construction Completion Report: June 2001 Operation & Maintenance Reports: 2001 - 2002 Groundwater Monitoring Reports: 2000 - 2009 |