State Coalition for Remediation of Drycleaners Site Profiles
Express Cleaners, Salina, Kansas
Description
|
Between 1985 and 1988 several public water supply (PWS) wells were tested and found to contain low levels of VOCs. Investigations led to the Express Cleaners site as a source for PCE contamination in the PWS wells. The drycleaning building has since been torn down and replaced by the Salina Regional Health Center. The construction of the new building was completed in conjuction with the installation of the remediation system. Remediation Status: In groundwater monitoring |
Contaminants
Contaminants present and the highest amount
detected in both soil and groundwater.
Contaminant | Media | Concentration (ppb) | Nondetect |
---|---|---|---|
cis-1,2-Dichloroethene | groundwater | ||
cis-1,2-Dichloroethene | soil | ||
1,2-Dichloroethane | groundwater | ||
1,1-Dichloroethene | groundwater | ||
1,1-Dichloroethene | soil | ||
Tetrachloroethene (PCE) | groundwater | ||
Tetrachloroethene (PCE) | soil | ||
Trichloroethene (TCE) | groundwater | ||
Trichloroethene (TCE) | soil | ||
trans-1,2-Dichloroethene | groundwater |
Site Hydrology
Deepest Significant Groundwater Contamination: | ||
Plume Size: | Plume Length: 3,600ft Plume Width: 1,000ft Plume Thickness: 50ft |
|
Average Depth to Groundwater: | 30ft |
Lithology and Subsurface Geology
Clay Depth: 0-15ft bgs 15ft thick Gradient: 0.007ft/ft |
||
silt Depth: 15-30ft bgs 15ft thick |
||
Medium to coarse grained sand with some gravel Depth: 30-75ft bgs 45ft thick |
||
bedrock Depth: 75ft bgs |
Pathways and DNAPL Presence
Groundwater Sediments Soil DNAPL Present |
Vapor Intrusion Pathway
Has the potential for vapor intrusion (VI) been evaluated? |
No |
|
Has a vapor mitigation system been installed? |
No |
Remediation Scenario
Cleanup
Goals: |
Reduce PCE groundwater contamination to below EPA Maximum Contaminant Level (MCL) of 5 µg/L. Reduce PCE soil contamination in accordance with KDHE Risk-Based Standards of 180 µg/kg. |
|
Remedy Level: |
Full Scale Remedy |
Technologies
In Situ Soil Vapor Extraction |
Why the technology was selected: Date implemented: Final remediation design: Results to date: Next Steps: Cost to Design and Implement: |
Costs
Cost
for Assessment: |
$27,798.80 | |
Cost
for Operation and Maintenance: |
Roughly $5000-$7000 per year. | |
Total
Costs for Cleanup: |
Lessons Learned
The SVE wells were installed during other construction activities onsite making access to the new building basement easier. |