State Coalition for Remediation of Drycleaners Site Profiles
Former Summer Custom Cleaners, Memphis, Tennessee
Description
|
The site operated as a drycleaning facility from 1968 until 2005. The facility is part of a three store strip mall that is currently being used as a clothing retailer. PCE was the only drycleaning solvent used on the property.
The contamination source area is located in the rear of the facility in the location of the former drycleaning machine.
There are no municipal drinking water wells within a one-mile radius of the site, nor any private drinking water wells in the vicinity of the site. Remediation Status: In groundwater monitoring |
Contaminants
Contaminants present and the highest amount
detected in both soil and groundwater.
Contaminant | Media | Concentration (ppb) | Nondetect |
---|---|---|---|
cis-1,2-Dichloroethene | groundwater | ||
cis-1,2-Dichloroethene | soil | ||
Tetrachloroethene (PCE) | groundwater | ||
Tetrachloroethene (PCE) | soil | ||
Trichloroethene (TCE) | groundwater | ||
Trichloroethene (TCE) | soil |
Site Hydrology
Deepest Significant Groundwater Contamination: | ||
Plume Size: | ||
Average Depth to Groundwater: | 12ft |
Lithology and Subsurface Geology
Brown-gray silty clays Depth: 0-28.5ft bgs 28.5ft thick Conductivity: 0.002834646ft/day Gradient: 0.02ft/ft |
||
sand and gravels Depth: 28.5ft bgs |
Pathways and DNAPL Presence
Groundwater Sediments Soil DNAPL Present |
Vapor Intrusion Pathway
Has the potential for vapor intrusion (VI) been evaluated? |
No |
|
Has a vapor mitigation system been installed? |
No |
Remediation Scenario
Cleanup
Goals: |
To achieve drinking water standards, while working towards an interim goal of plume contraction. |
|
Remedy Level: |
Full Scale Remedy |
Technologies
In Situ Biostimulation |
Why the technology was selected: Date implemented: Final remediation design: Results to date: Next Steps: Cost to Design and Implement: |
|
In Situ Zero Valent Iron |
Why the technology was selected: Date implemented: Final remediation design: Results to date: Next Steps: Cost to Design and Implement: |
Costs
Cost
for Assessment: |
$113,521 | |
Cost
for Operation and Maintenance: |
||
Total
Costs for Cleanup: |
$213,814.00 |
Contacts
Nancy Boisvert Program Manager TDEC-DoR Drycleaner Response Program 401 Church St. Nashville TN 615-263-3876 Elizabeth Bishop Innovative Environmental Technologies 6130 Kit Road, Pipersville, PA www.iet-inc.net 888-721-8283 elizabethbishop@iet-inc.net |