Former American Cleaners - Arnold Park Mall, Arnold, Missouri
Description
|
American Cleaners operated at the Arnold Park strip mall for over 25 years. The strip mall is located at the intersection of Highway 141 and Jeffco Boulevard north of Arnold. The drycleaners is no longer in operation, but the site/area is still a strip mall. Remediation Status: Site closed |
Contaminants
Contaminants present and the highest amount
detected in both soil and groundwater.
Contaminant | Media | Concentration (ppb) | Nondetect |
---|---|---|---|
chloroform | groundwater | 8.2 ppb | |
cis-1,2-Dichloroethene | groundwater | 3,790 ppb | |
cis-1,2-Dichloroethene | soil | 230 ppb | |
Tetrachloroethene (PCE) | groundwater | 6,150 ppb | |
Tetrachloroethene (PCE) | soil | 310 ppb | |
Trichloroethene (TCE) | groundwater | 814 ppb | |
Trichloroethene (TCE) | soil | 175 ppb | |
toluene | soil | 7 ppb | |
trans-1,2-Dichloroethene | groundwater | 814 ppb | |
trans-1,2-Dichloroethene | soil | 6.6 ppb |
Site Hydrology
Deepest Significant Groundwater Contamination: | 29ft bgs | |
Plume Size: | ||
Average Depth to Groundwater: | 22.5ft |
Lithology and Subsurface Geology
Silty clay, clay and stiff clay with chert fragments |
Pathways and DNAPL Presence
Groundwater Sediments Soil DNAPL Present |
Vapor Intrusion Pathway
Has the potential for vapor intrusion (VI) been evaluated? |
Yes |
|
How was the site evaluated? |
Groundwater sampling,Compared sample concentration to screening criteria |
|
Results of VI evaluation: |
A completed VI pathway has been indentified | |
Has a vapor mitigation system been installed? |
No | |
Additional VI Information: |
For the indoor inhalation pathway, the representative concentration for PCE was calculated and determined to be below the residential levels. |
Remediation Scenario
Cleanup
Goals: |
Drinking Water Pathway: acetone, 2.97 mg/L; trans 1,2-DCE, 0.1 mg/L; cis 1,2-DCE, 0.07 mg/L; chloroform, 0.08 mg/L; PCE, 0.005 mg/L; TCE, 0.005 mg/L; toluene, 1.0 mg/L Inhalation Pathway from Groundwater: acetone, 101,000 mg/L; trans 1,2-DCE, 1.78 mg/L; cis 1,2-DCE, 19.4 mg/L; chloroform, 0.814 mg/L; PCE, 1.95 mg/L; TCE, 4.49 mg/L; toluene, 117 mg/L Inhalation Pathway from Subsurface Soil: acetone, 143,000 mg/L; trans 1,2-DCE, 8.62 mg/L; cis 1,2-DCE, 7.01 mg/L; chloroform, 0.310 mg/L; PCE, 2.14 mg/L; TCE, 5.04 mg/L; toluene, 140 mg/L |
Technologies
In Situ Monitored Natural Attenuation |
Final remediation design: Results to date: Next Steps: |
Costs
Cost
for Assessment: |
Not available | |
Cost
for Operation and Maintenance: |
||
Total
Costs for Cleanup: |
Contacts
Scott Huckstep Missouri Department of Natural Resources Brownfields/Voluntary Cleanup Program (573) 526-2740 scott.huckstep@dnr.mo.gov Participant's Consultant: Shifrin @ Associates Walter G. Shifrin, President (314)721-2249 wshifrin@shifrinandassociates.com |