Description
|
The subject property is a historical dry cleaning facility. This property is located in a heavily developed part of Corpus Christi approximately 1,000 feet from Corpus Christi Bay. Currently, the location of the former dry cleaner has been redeveloped and contains a multistory parking garage associated with nearby medical facilities including the Christus Spohn Hospital located immediately south of the former cleaners. Remediation Status: Site closed |
Contaminants
Contaminants present and the highest amount
detected in both soil and groundwater.
Contaminant | Media | Concentration (ppb) | Nondetect |
---|---|---|---|
trans-1,2-Dichloroethene | groundwater | 148 ppb | |
cis-1,2-Dichloroethene | groundwater | 522 ppb | |
Tetrachloroethene (PCE) | groundwater | 431 ppb | |
Trichloroethene (TCE) | groundwater | 656 ppb | |
Vinyl Chloride | groundwater | 20.4 ppb |
Site Hydrology
Deepest Significant Groundwater Contamination: | 22ft bgs | |
Plume Size: | Plume Length: 220ft Plume Width: 75ft Plume Thickness: 2ft |
|
Average Depth to Groundwater: | 21ft |
Lithology and Subsurface Geology
Beaumont Clay Formation |
This formation consists of poorly-bedded clay and marl, interbedded with lenses of sand. The Beaumont clay can be sandy and comprised of reddish-brown clay with some sand beds. |
|
Montgomery Formation |
||
Bently Formation |
||
Willis Sand |
Pathways and DNAPL Presence
Groundwater Sediments Soil DNAPL Present |
Vapor Intrusion Pathway
Has the potential for vapor intrusion (VI) been evaluated? |
No |
|
Has a vapor mitigation system been installed? |
Remediation Scenario
Cleanup
Goals: |
Reduce COC concentrations below PCLs |
|
Remedy Level: |
Interim Action |
Technologies
In Situ Bioremediation |
Why the technology was selected: Date implemented: Final remediation design: Results to date: Cost to Design and Implement: |
|
In Situ Monitored Natural Attenuation |
Why the technology was selected: Date implemented: Final remediation design: Results to date: Cost to Design and Implement: |
Costs
Cost
for Assessment: |
$143,542.47 | |
Cost
for Operation and Maintenance: |
||
Total
Costs for Cleanup: |
Lessons Learned
Learned what works and what doesn't as far as bioremediation and the amount of Cl-Out used. Learned that the use of bioremediation should be tailored to each specific site, and not used the same way at all sites. |
Contacts
David Cullen Project Manager Texas Commission on Environmental Quality PST/DCRP Section, Remediation Division, MC-137 P.O. Box 13087 Austin, TX 78711-3087 |
Site Specific References
Response Action Completion Report 2011 Sampling Event Summary and Status Report 2011 |