Description
|
The site was previously occupied by Gateway Cleaners, a full service dry cleaning company from 1988 to 1998. The facility is located in a strip mall in a mixed commercial setting. Site is now Lamp and Lantern Village The contaminant source areas identified at the drycleaner include the soils beneath the concrete floor. There was minimal to moderate staining on the surrounding walls and floors from the past use of dry cleaning equipment. |
Contaminants
Contaminants present and the highest amount
detected in both soil and groundwater.
Contaminant | Media | Concentration (ppb) | Nondetect |
---|---|---|---|
cis-1,2-Dichloroethene | groundwater | 260 ppb | |
cis-1,2-Dichloroethene | soil | 510 ppb | |
Tetrachloroethene (PCE) | groundwater | 200 ppb | |
Tetrachloroethene (PCE) | soil | 15,900,000 ppb | |
Trichloroethene (TCE) | groundwater | 80 ppb | |
Trichloroethene (TCE) | soil | 250 ppb | |
Vinyl Chloride | groundwater | 180 ppb | |
Vinyl Chloride | soil | ND |
Site Hydrology
Deepest Significant Groundwater Contamination: | ||
Plume Size: | ||
Average Depth to Groundwater: | 19ft |
Lithology and Subsurface Geology
Brown silty clay to brown fatty clay Depth: 0-34ft bgs 34ft thick |
Pathways and DNAPL Presence
Groundwater Sediments Soil DNAPL Present |
Remediation Scenario
Cleanup
Goals: |
Soil: PCE = 55 mg/kg; TCE = 56 mg/kg Groundwater: PCE = 0.005 mg/L; TCE = 0.005 mg/L. |
Technologies
In Situ Cap |
Why the technology was selected: Date implemented: Final remediation design: Other technologies used: Results to date: |
|
Ex Situ Incineration |
Date implemented: Final remediation design: Other technologies used: Results to date: |
|
Ex Situ Soil Removal |
Why the technology was selected: Date implemented: Final remediation design: Other technologies used: Results to date: |
Costs
Cost
for Assessment: |
||
Cost
for Operation and Maintenance: |
||
Total
Costs for Cleanup: |
Lessons Learned
1. Make sure the consultant is aware of the proper cleanup level for the applicable state program. 2. Drill deep wells at the start of site characterization. |
Contacts
Mr. Ken Koon Missouri Department of Natural Resources Hazardous Waste Program Brownfields/Voluntary Cleanup Program Dry Cleaner Remediation Unit PO Box 176 Jefferson City, MO 65102 (573) 522-1597 |