Description
|
This is an active PCE drycleaning facility located in a shopping center. Prior to becoming eligible for the Florida Drycleaning Solvent Cleanup Program, assessment work had been conducted at the site in 1989, and 1992-95.
The site is located in a retail commercial/residential setting. Another active drycleaner is located approximately 550 feet southwest (hydraulically upgradient) of the site. Remediation Status: In groundwater monitoring |
Contaminants
Contaminants present and the highest amount
detected in both soil and groundwater.
Contaminant | Media | Concentration (ppb) | Nondetect |
---|---|---|---|
Tetrachloroethene (PCE) | groundwater | ||
Tetrachloroethene (PCE) | soil |
Site Hydrology
Deepest Significant Groundwater Contamination: | 25ft bgs | |
Plume Size: | Plume Length: 480ft Plume Width: 350ft Plume Thickness: 10ft |
|
Average Depth to Groundwater: | 14.5ft |
Lithology and Subsurface Geology
fine to medium-grained sand with minor silt content Depth: 0-25ft bgs 25ft thick Conductivity: 8.5ft/day Gradient: 0.005ft/ft |
||
silty clay Depth: 25-30ft bgs 5ft thick |
||
silty, medium to coarse-grained sand with phosphate nodules and minor clay Depth: 30-50ft bgs 20ft thick |
||
silt and weathered limestone Depth: 50-55ft bgs 5ft thick |
||
silt and fine to medium-grained sand with phosphate nodules grading to clay Depth: 55-75ft bgs 20ft thick |
Pathways and DNAPL Presence
Groundwater Sediments Soil DNAPL Present |
Vapor Intrusion Pathway
Has the potential for vapor intrusion (VI) been evaluated? |
No |
|
Has a vapor mitigation system been installed? |
Yes | |
Type of Vapor Mitigation System(s): |
Soil Vapor Extraction |
Remediation Scenario
Cleanup
Goals: |
Soil: PCE - 30 ug/kg Groundwater: PCE - 3 ug/l |
|
Remedy Level: |
Full Scale Remedy |
Technologies
In Situ Monitored Natural Attenuation |
Why the technology was selected: Results to date: Next Steps: |
|
In Situ Soil Vapor Extraction |
Why the technology was selected: Date implemented: Final remediation design: Results to date: Next Steps: Cost to Design and Implement: |
|
Ex Situ Carbon Adsorption |
Date implemented: Final remediation design: Results to date: Next Steps: Cost to Design and Implement: |
Costs
Cost
for Assessment: |
$75,100 | |
Cost
for Operation and Maintenance: |
Total O&M (includes monitoring); $12,500 | |
Total
Costs for Cleanup: |
$167,900 |
Contacts
Aaron Cohen Florida Dept. of Environmental Protection Bureau of Waste Cleanup, MS 4500 2600 Blair Stone Road Tallahassee, Florida 32399 850-245-8974 Aaron.Cohen@dep.state.fl.us Mike Lodato, PG Geosyntec Consultants 14055 Riveredge Drive, Suite 300 Tampa, Florida 33637 Phone: (813) 558-0990 E-mail: mlodato@geosyntec.com |
Site Specific References
Site Assessment Report: July 2005 Remedial Action Plan: September 2005 Soil Vapor Extraction System Construction Completion Report: May 2007 Operation & Maintenance Reports: 2007 Post Active Remedial Monitoring Reports: 2008 |