Search Result
CONSTRUCT AND COMMISSION GROUNDWATER TREATMENT SYSTEM
Department of the Interior, National Park Service, San Francisco.
Federal Business Opportunities, FBO-5948, Solicitation 140P8618R0013, 2018
This requirement is a 100% small business set-aside, NAICS code 237110, size standard $36.5M. Contractor services are needed to construct and commission a groundwater treatment system for the North Caponier fuel tank, Alcatraz Island, Calif. The North Caponier tank is located on the northwest corner of Alcatraz Island in the San Francisco Bay. The structure sits adjacent to the Bay and was built on a combination of fractured Franciscan bedrock and fill. The general condition of all buildings is poor. Contractor services are required to install a pilot groundwater extraction system to recover water from beneath the North Caponier and to install a pilot groundwater treatment system to batch-process water extracted from the North Caponier for off-haul. The construction range for this project is $250,000-$500,000. Responses must be received by 8:00 PM ET on May 2, 2018. See details on FedConnect at https://www.fedconnect.net/FedConnect/?doc=140P8618R0013&agency=DOI [Note: It might be necessary to copy and paste the URL into your browser for direct access].
Federal Business Opportunities, FBO-5948, Solicitation 140P8618R0013, 2018
This requirement is a 100% small business set-aside, NAICS code 237110, size standard $36.5M. Contractor services are needed to construct and commission a groundwater treatment system for the North Caponier fuel tank, Alcatraz Island, Calif. The North Caponier tank is located on the northwest corner of Alcatraz Island in the San Francisco Bay. The structure sits adjacent to the Bay and was built on a combination of fractured Franciscan bedrock and fill. The general condition of all buildings is poor. Contractor services are required to install a pilot groundwater extraction system to recover water from beneath the North Caponier and to install a pilot groundwater treatment system to batch-process water extracted from the North Caponier for off-haul. The construction range for this project is $250,000-$500,000. Responses must be received by 8:00 PM ET on May 2, 2018. See details on FedConnect at https://www.fedconnect.net/FedConnect/?doc=140P8618R0013&agency=DOI
The Technology Innovation News Survey welcomes your comments and
suggestions, as well as information about errors for correction. Please
contact Michael Adam of the U.S. EPA Office of Superfund Remediation
and Technology Innovation at adam.michael@epa.gov or (703) 603-9915
with any comments, suggestions, or corrections.
Mention of non-EPA documents, presentations, or papers does not constitute a U.S. EPA endorsement of their contents, only an acknowledgment that they exist and may be relevant to the Technology Innovation News Survey audience.