Skip to main content
U.S. flag

An official website of the United States government

Dot gov

The .gov means it's official.
Federal government websites often end in .gov or .mil. Before sharing sensitive information, make sure you're on a federal government site.

Https

The site is secure.
The https:// ensures that you are connecting to the official website and that any information you provide is encrypted and transmitted securely.

information

We are making some changes to CLU-IN. If you have any feedback or questions, please contact us.

Share |
Connect | Archived Internet Seminars and Podcasts News Feeds (RSS) TechDirect and Newsletters

Green Remediation Focus

Barksdale Air Force Base

Bossier City, Louisiana

Federal Facility

Image Gallery

image
Material Recycling
image
Erosion/Stormwater Controls
image
Selective Tree Removal
image
Riparian Area
image
Wetland Border
image
Thriving Vegetative Cover


Cleanup Objectives: Contain 25 acres of construction debris and hazardous waste (including petroleum-based solvents and metals) constituting an onsite landfill adjacent to a wetland area and the Flat River

Green Remediation Strategy: Modified the original construction plan for landfill cover to capitalize on green construction methods and meet federal "greening the government" goals, while expanding the facility's natural resource conservation program

  • Retained an existing natural levee to maintain the habitat corridor, minimize riparian ecosystem disturbance, and provide secondary erosion controls
  • Developed a drainage design and construction plan recreating natural hydraulic patterns of the wetland and river
  • Removed trees and shrubs selectively and chipped/recycled the material for placement on hiking trails within the facility's conservation area
  • Used uncontaminated spoil material from previous dredging operations to construct an 18-inch low-permeability cover
  • Used demolition concrete as rip-rap and aggregate material for stormwater runoff management and as base fill for access roads
  • Removed, stockpiled, and later reapplied topsoil to enhance plant growth on the landfill cover surface
  • Installed immediate grass cover on the cover surface for erosion and sediment transport control, followed by seeding of native drought-resistant wildflowers

Results:

  • Used low impact development designs for constructing on-site drainage systems that mirror natural hydraulic conditions of the greater area
  • Recycled 1,000 tons of concrete debris
  • Reused 60,500 cubic yards of topsoil and subsurface material
  • Saved 700 tons of removed woody material for beneficial use
  • Saving approximately $1,800 each year in fuel and labor costs for site maintenance, through installation of a final landfill cover of native plant species needing infrequent mowing
  • Achieved economic benefits totaling over $377,000 through sustainable design and construction of the remedy
  • Integrated the facility's conservation plan into long-term stewardship of cleanup actions at "landfill 3" while preserving integrity of daily flight activities

Property End Use: Ongoing military operations

Point of Contact: Wallace Robertson, Barksdale Air Force Base