Green Remediation Focus
Barksdale Air Force Base
Bossier City, Louisiana
Federal Facility
Cleanup Objectives: Contain 25 acres of construction debris and hazardous waste (including petroleum-based solvents and metals) constituting an onsite landfill adjacent to a wetland area and the Flat River
Green Remediation Strategy: Modified the original construction plan for landfill cover to capitalize on green construction methods and meet federal "greening the government" goals, while expanding the facility's natural resource conservation program
- Retained an existing natural levee to maintain the habitat corridor, minimize riparian ecosystem disturbance, and provide secondary erosion controls
- Developed a drainage design and construction plan recreating natural hydraulic patterns of the wetland and river
- Removed trees and shrubs selectively and chipped/recycled the material for placement on hiking trails within the facility's conservation area
- Used uncontaminated spoil material from previous dredging operations to construct an 18-inch low-permeability cover
- Used demolition concrete as rip-rap and aggregate material for stormwater runoff management and as base fill for access roads
- Removed, stockpiled, and later reapplied topsoil to enhance plant growth on the landfill cover surface
- Installed immediate grass cover on the cover surface for erosion and sediment transport control, followed by seeding of native drought-resistant wildflowers
Results:
- Used low impact development designs for constructing on-site drainage systems that mirror natural hydraulic conditions of the greater area
- Recycled 1,000 tons of concrete debris
- Reused 60,500 cubic yards of topsoil and subsurface material
- Saved 700 tons of removed woody material for beneficial use
- Saving approximately $1,800 each year in fuel and labor costs for site maintenance, through installation of a final landfill cover of native plant species needing infrequent mowing
- Achieved economic benefits totaling over $377,000 through sustainable design and construction of the remedy
- Integrated the facility's conservation plan into long-term stewardship of cleanup actions at "landfill 3" while preserving integrity of daily flight activities
Property End Use: Ongoing military operations
Point of Contact: Wallace Robertson, Barksdale Air Force Base