CLU-IN Home

U.S. EPA Contaminated Site Cleanup Information (CLU-IN)


U.S. Environmental Protection Agency

Site-Specific Optimization Review Reports

Long-Term Groundwater Optimization: Clare Water Supply Superfund Site (Permeable Reactive Barrier and Soil Remedy Areas)

View reports by:   Optimization Stage | EPA Region | Site Name | Search

Optimization Report Summary

CLARE WATER SUPPLY Links to a website outside of Clu-In
CLARE, MI
EPA Region 5

Report Date:  3/22/07

View Report:  Long-Term Groundwater Optimization: Clare Water Supply Superfund Site (Permeable Reactive Barrier and Soil Remedy Areas) Long-Term Groundwater Optimization: Clare Water Supply Superfund Site (Permeable Reactive Barrier and Soil Remedy Areas)

The information presented in the tables below has been extracted from the report. For complete details, view the full report from the link above.

Optimization Stage Interim Remedy Date ROD Signed Responsible Party Type Tribal Involvement
Long-term Monitoring Optimization Stage
No 9/16/92 Private No
Lead Type Site Type Affected Media Remedies/Technologies Contaminant Groups
  • None identified
  • Industrial
  • Groundwater
  • Air Sparging
  • Ozone (In Situ Chemical Oxidation)
  • 1,2-Dichloroethenes
  • Halogenated VOCs

Top of Page